Build a Deck

Tom Silva helps a couple replace a rotted deck with a 20 by 20 foot two-level deck.

Key moments

  1. Deck plan and permit

    Watch this moment · 0:27
  2. Batter boards and layout

    Watch this moment · 1:52
  3. Squaring the corner with 3-4-5

    Watch this moment · 4:02
  4. Auguring 48-inch footing holes

    Watch this moment · 5:13
  5. Setting form tubes and inspection

    Watch this moment · 5:44
  6. Post bases on concrete columns

    Watch this moment · 7:12
  7. Flashing and ledger board

    Watch this moment · 8:36
  8. Lag bolts and joist hangers

    Watch this moment · 12:38
  9. Laser level and beam notches

    Watch this moment · 14:00
  10. Framing the diagonal step

    Watch this moment · 16:46

Key facts

MaterialsPressure-treated 2×8 ledger board, 2×8 joists, two 2×12 beams, 6×6 posts, 12-inch paper form tubes, pre-mixed concrete bags, expansion bolts, metal post bases, timber hangers, self-sealing membrane flashing, 6-inch lag bolts, galvanized carriage bolts
Safety warningA building inspector must measure each footing hole before concrete is poured. Lag bolts are pre-drilled and staggered to avoid splitting the ledger.
Call a pro?Permit or a pro may be required