Renovation Videos

Fix it, build it, learn it.

Whole House Remodel

A builder installs a FlexStone tub and shower surround over green board drywall in a mid-range bathroom remodel instead of tiling.

Key moments

  1. Installing the waterproof corners with a silicone bead

    Watch this moment · 0:45
  2. Finding the center and scribing the back panel

    Watch this moment · 2:14
  3. Trimming the panel with a circular saw

    Watch this moment · 4:47
  4. Applying adhesive to the wall and setting the panel

    Watch this moment · 5:17
  5. Running the trim along the tub and shimming the panels

    Watch this moment · 7:58
  6. Installing the tub spout with a slip fitting

    Watch this moment · 11:49
  7. Shower head filter and flow restrictor

    Watch this moment · 16:42
  8. Sealing the seams with clear silicone

    Watch this moment · 17:17
  9. What he liked and disliked

    Watch this moment · 17:53

Key facts

MaterialsFlexStone surround panels, waterproof corners, silicone, panel adhesive, trim, 2×4, shims, 1/2 in. copper pipe, slip fitting with O-rings, Teflon tape, M Seal, clear silicone sealant, green board drywall
ProjectWhole House Remodel
Series channelMR Post Frame

Sources: The facts and written text on this page come from the 1 video on this page, by MR Post Frame.